Case: Minimizing Downtime
A busy radiology department relies heavily on its CT scanner for diagnostic imaging. Recently, the department experienced an unexpected system failure during peak hours, causing significant delays in patient care. The failure was traced back to a single point of failure in the power supply unit. The department needs to implement strategies to minimize future downtime and ensure continuous operation.
CTbeginner
CTAI-GENERATED
The CT scanner is shown in a busy hospital setting, with patients waiting and technicians attempting to troubleshoot the system.
1 / 3
What is the first step the department should take to minimize future unplanned downtime?